Award Reversed Because of No Expert Testimony
Executive Summary: A Washington concrete contractor, Salinas Construction, Inc. (SCI), was awarded $404,000 of its requested $425,000 for a job at U.S. Army Joint Base Lewis-McChord only to see this decision reversed in district court. The problem was that SCI did...
Notice – When in doubt, write it out!
Executive Summary: Looking at a recent case in the state of Washington, a contractor attempted to be compensated for additional cost resulting from the project engineer’s direction to perform work different from the contractor’s desired sequence. The Court ruled...
Contractor Wins Acceleration Impact Cost and the Incentive Payment
Contractor Wins Acceleration Impact Cost AND the Incentive Payment (1995) Executive Summary: The Pennsylvania Department of Transportation (PennDOT) awarded a time sensitive bridge rehabilitation project to a contractor and, within the contract, provided a large daily...
SJCC Toolbox Terms & Glossary
Listen to our podcast for new terms and check out our glossary below. Click on a term to find articles that reference that term. Glossary of Terms A Aggregate – Coarse material such as sand, gravel, or other crushed rock. Often used as a substrate or base...
Previous Episodes & Issue Archive
Previous Episodes Subscribe and listen to the Pipeline Podcast and check out back issues of the Pipeline Newsletter below. Click here for more podcast episodes. Issue Archive Click here for individual articles. 2022 Week 6: Why To Get A Contractor’s License 2021 Week...